River’s Edge Hospital and Clinic

  • Gilbert recently completed this 33,000 sq ft addition and 40,000 sq ft remodel project, which included an 11,800 sq ft Emergency Department addition, Operating Room addition and remodel, additional patient rooms and a boiler plant upgrade. The project was completed while the hospital maintained operational, which required the project to be broken into 25 phases over 25 months.
  • Mechanical systems included replacement of hot water boilers, rooftop air handling systems, medical gas systems, plumbing piping, snow melt systems and control system upgrades.
  • Customer:  River’s Edge Hospital (end user); McGough Construction (GC)
  • Budget:  $6,915,000